Arup London office revamp

Phase 2 – shift, and test 200 cat 6, run additional 32 x cat 6 for new office layout

04/06/2018

Zentura – New client!

Clarkenwell London office rewire Cat 5e. Power and lighting.

23/05/2018

Creative Queen st London

power and data for new office, floor boxes, Cat 6, adjusted lighting to suit, Wifi install, Web Cam install, screen install.

21/05/2018

Arup London office revamp

Phase 1 revamp, shift, re-terminate and test 200 cat 6 points in floor boxes.

08/05/2018

St Jon st London

power and data install for new office, 200 x cat 6a, using floor boxes and GOP boxes, metal clad. Power and lighting provided

02/05/2018

Arup London office

installed 16 x cat 6 in existing office space for new desk layout.

30/03/2018

Arup Cardiff office

install data points ready for new CCTV system.

26/03/2018

Arup Leeds office visit

Visited Arup leeds office to clear some cabling faults.

07/03/2018

Connected homes – Leicester

Cabled existing office space with dual network using CAT 6

26/02/2018

ARUP – Winchester new office

Cabled new office for client in Winchester, CAT 6, installed switch and patched ports live ready for client to move in.

21/02/2018

Shootershill school cabling

Data and power installed in 3 compartment trunking for new classroom.

14/02/2018

ARUP – Whitehaven road trip

Traveled to White-haven Cumbria for ARUP to install AV equipment and WiFi AP’s

12/12/2017

SilverFern IT – ID Terminate and test

48 x cat 6 ID terminate and test – London

16/10/2017

SKANSEN – Rewire Harlow

Office rewire in CAT 5e as per Client requirements

18/09/2017

Silver Fern IT – Office rewire

206 CAT 6a install – London

21/08/2017

SKANSEN – Rewire London Golden Square

Fibre and Telephone backbone install

14/08/2017

New Client SKANSEN

05/06/2017

PLP – Office re-wire – 72 Cat 6

02/05/2017

ID and removal of reduandant cabling for JonesFM

22/02/2017

AECOM – Basingstoke repatch and document part 2

18/02/2017

AECOM – St.Albans server cab link

14/02/2017

AECOM – Basingstoke repatch and document part 1

11/02/2017

TSK – Leicester 927 Cat 6

20/01/2017

Shooterhill School cab replace

03/01/2017

Connected homes office re-wire

16/12/2016

Connected Homes London office cab relocation

02/12/2016

Connected Homes – Cambrifge office additional cabling

150 x Cat6 and Fibre backbone added. Installed out of hours with no disruption or down time to working office.

10/11/2016

Arup London Switch upgrade

22/10/2016

Aecom – Basingstoke server links

Aecom Basingstoke office – 96 port cat 6a link and 96 core fibre link delivered and installed in one day on site with no down time to the client.

07/10/2016

ARUP York office switch upgrade and re-patch

14/09/2016

AECOM Croydon – 11 x Cat 6

12/09/2016

ARUP London – 8 x Cat 6

27/08/2016

ARUP London – 10 x Cat 6

06/08/2016

AECOM Croydon – 247 x Cat 6

Working along side main contractor.

Re-cable 1st floor Sunley house Croydon AECOM.

23/06/2016

ARUP Sheffield – 516 x Cat 6A

Working along side main contractor.

Re-cable Arup Sheffield office new office space.

18/06/2016

TSK Mancherster 312 x Cat 6

working with main contractor TSK to re-cable new office space.

02/06/2016

Connected homes London – 240 x Cat 6

17/05/2016

TSK Luton – 1312 x Cat 6

8 week project working for main contractor TSK.

09/05/2016

TSK – ARUP Manchester – 216 x Cat 6A

working for main contractor TSK for re-cable Arup Manchester new office space.

02/05/2016

SKANSKA Peterborough – 82 x Cat 5e

09/03/2016

AECOM Swindon – Test and document 619 x Cat 5e

12/02/2016

SKANSKA Ipswich 74 x Cat 6

30/09/2015

AECOM York – 135 x Cat 5e

22/09/2015

ARUP London – 620 x Cat 6A

6 week project working along side main contractor.

Re-cable 1st floor 13 Fitzroy st

27/08/2015

AECOM Holborn – 24 x Cat 6A server link

21/08/2015

ARUP London – 420 x Cat 6A

6 week project working along site main contractor.

Re-cable 5th floor 13 Fitzroy st.

02/06/2015

ARUP London – 652 x Cat 6A

6 week project working along side main contractor

Re-cable 2nd floor 13 Fitzroy st.

11/05/2015

Miller Hare London – 82 x Cat 6

01/05/2015

PLP architecture London – 1194 x Cat 6

12 week project working along side main contractor.

16/02/2015

ARUP London 352 x Cat 6A

6 week project working along side main contractor.

Re-cable 6th floor 13 Fitzroy street London.

02/02/2015

MAKE architecture London – 672 x cat 6

8 week project working along side main contractor.

05/01/2015

SKANSKA Maple cross 48 x Cat 6

01/10/2014

AECOM Holborn – 24 x Cat 6

30/09/2014

SKANSKA Ipswich 74 x Cat 6

25/09/2014

SKANSKA Ipswich – 88 x Cat 6 carry out fluke test

25/09/2014

Additional Fibre install at ARUP data centre

16/09/2014

20 x Cat 5e SKANSKA Bristol

01/09/2014

AECOM Croydon – 173 x Cat 6

11/08/2014

Aecom London – Wifi install

4 Week project out of hours to upgrade Wifi network.

02/08/2014

CAR GIANT – Migration to Cisco IP phone system

3 week project to assist client on the migration from current digital phone system to Cisco IP Call manager.

01/07/2014

CAR GIANT – Telephone system maintenance

24/06/2014

CAR GIANT – Telephone system maintenance

12/06/2014

CAR GIANT – Telephone system maintenance

09/06/2014

12 x Cat 6 ARUP London

07/06/2014

48 x Cat 6 Aecom London

24/05/2014

48 x Cat 5e SKANSKA Cambridge site

21/05/2014

CAR GIANT – Telephone system maintenance

12/05/2014

Aecom London office

Out of hours night/early morning project for Aecom:

testing and documentation of current CAT 6 structured cabling

30/04/2014

16 x CAT 5e Skanska Valentines place

25/04/2014

HC – New Client AECOM !!

01/04/2014

48 x CAT 6 ARUP London office

29/03/2014

34 x CAT 5e Skanska Eastcheap London

17/03/2014

12 x CAT 5e Skanska Almondsbury

18/02/2014

Avon School Skanska

12 x CAT 5e Avon school Skanska

07/02/2014

Burberry London Covent garden

CAT 6 project for Burberry London Covent garden. 284 cables installed.

02/12/2013

Balans Restaurant – Old Compton st

CAT 6 project Balans restaurant London Old Compton st.

11/11/2013

install 4G network at Skanska London site

20/09/2013

install 4G network at Skanska London site

19/09/2013

install 4G network at Skanska London site

18/09/2013

12 x CAT 5e Skanska site office London

09/07/2013

HC – New client SKANSKA !!

02/07/2013

210 CAT 6 AFR London

3 week project to install floor boxes and structured cabling for AFR London

03/06/2013

48 x CAT 6 ARUP Leeds office

13/05/2013

ARUP G.13 project

Working closely with main contractor on a 6 week project we stripped out old carpet, relocated existing floor boxes added additional where needed to meet requirements of new furniture layout, including any additional high and low level data that was required by the client.

08/04/2013

Re-cable new offcie space 120 CAT 5e Kolbolt London

18/03/2013

AECOM Holorn – 60 x Cat 6

18/03/2013

Floor boxes, Power and data install Imagination London

02/03/2013

Quintessentially London – 104 x Cat 5e

08/02/2013

Removal of server kit from London, deliver and install ARUP data centre

01/02/2013

Removal of servers from London, deliver and install at ARUP data centre

26/01/2013

12 x CAT6 insatlled for ARUP

12/01/2013

40 x CAT6 installed

40 x CAT6 cables installed for Arup, Fitzroy Street W1

06/10/2012

Floor box installation completed

19 x Newlec floor boxes supplied and installed with 4 x CAT5e and power to each. Work carried out for Osborn Contracts Ltd at Valentines Place, Southwark.

26/09/2012

Power and Data for Imagination

New Power and Data installed for new office layout for Imagination London, South Crescent WC1

31/08/2012

Installation completed

Installation of 60 x CAT5e cables completed in Liverpool.

12/07/2012

Arup Data centre goes live

Arup Data centre is now live as on June 2012.

10/06/2012