Arup at Hoddesdon

Pictures from our March – April 2012 Data centre installation for Arup at Hoddesdon. Work was carried out using Molex PowerCat 6A Shielded solution.

This was a 6 week on site project with 1680 CAT6A cables and 60 cores of Multimode fibre installed.

We worked closely with Arup IT to design and implement a structured cabling system to suit the needs in the Data Centre.

We also carried out the customer patching of both copper and fibre systems to the active equipment.